Crown Ranch Project
"The Johnson Project" is a new roof that sits just above 120 squares of a custom-built home. Clients were overly satisfied, all that is needed by JFM is to go back and install metal dormers. From start to finish the project was a one-day event for JFM Construction Services.
Beehive Salon Project
Full remodel from top to bottom, The floors were stripped and replaced with engineer glue-down flooring. This was a project of a 1500 sq ft remodel. From adding cubicles to retexture and repainting the entirety of the building. Installations included six brand new shampoo bowls and a full remodel of their breakroom. Also replaced all ceiling tiles and part of the grids. Finishing off with a surround sound system, donated by JFM services.
The project was asked to be completed in 30 days; the project was completed in 9, in an effort to accommodate the grand opening of the salon.
Hobby Airport Project
A full remodel caused by the flood of Hurricane Harvey, 17 offices, and a lobby was fully remodeled by JFM services. Cool coating was applied to this job as a way to keep the roofs from contracting too much heat. Many leaks were also repaired, from 1-inch holes to a square foot of holes were repaired and managed.